  • Supervised fabrication of subsea and onshore LNG assets, including 13 x 22” trunkline Type I PLETs, 4 x 22” valve skids, 36 x 10” manifolds & well-side structures.

  • Monitored PQR welding activities, hydrotesting, and leak testing, ensuring strict compliance.

  • Witnessed FAT/EFAT activities, validating system performance. Impact: Guaranteed integrity and safe delivery for one of the world’s largest LNG projects.

Screenshot 2026-01-22 at 10.24.05 PM.png

MOZAMBIQUE LNG PROJECT | TOTALENERGIES | | JAN 2025 – PRESENT

ASSUIT HYDROCRACKING COMPLEX (AHC), EGYPT | ANOPIC | TECHNIP ENERGIES | SEP 2022 – JAN 2025

Oversaw >1M inch piping fabrication: carbon steel, low alloy (P5, P9, P22), stainless steel (304, 316, 321),

and exotic alloys. Led fabrication of

Reformer & Heater units with high-temperature service piping.

Coordinated Test Packs, Pre- commissioning, and Reinstatement.

Validated WPS/PQR, NDT & welder qualifications per ASME/AWS.

Impact: Delivered seamless execution of one of Egypt’s largest downstream mega-

projects.

Picture 1.jpg
Screenshot 2026-01-22 at 8.44.42 PM.png

NORTH SAFA PLATFORM PROJECT | GUPCO | PETROJET | JUN 2022 – SEP 2022

Reviewed and validated ITPs, MTCs, WPS/WB, and NDT procedures. Supervised fabrication of deck structures, jackets, and piles.

Monitored dimensional controls, progress, and technical reporting. Impact: Ensured timely and high-quality delivery of critical offshore platform structures.

MIDOR REFINERY EXPANSION PROJECT, EGYPT | MIDOR | TECHNIP ENERGIES/TÜV RHEINLAND | SEP 2020 – JUN 2022

Supervised fabrication of >670,000 inch piping (carbon, alloy, stainless). Oversaw welding inspections, WPS/PQR, and NDT validations.

Coordinated QA/QC, audits, FAT/EFAT testing, reinstatement & turnover packages.

Impact: Strengthened one of the largest refining assets in North Africa, ensuring modernization and compliance.

Picture 2.jpg
  1. PP-2 PETRECO Subsea Spools Project : Supervised fabrication & installation of 4 subsea spools & risers (12 km, 18”).Ensured welding quality, NDT compliance, and offshore standards. Delivered critical subsea pipeline infrastructure.

  2. Zohr Field Development Project – Phases I & II : Phase I: Fabricated 8 Infield PLETs, 1 Export PLET, 12 PWMD piles (~4,000 tons).Phase II: Supervised 24 Infield & Service PLETs, 39 PWMD piles, 60 jumpers (~6,500 tons). Directly supported Zohr’s milestone as the largest Mediterranean gas field.

Picture 3.jpg

OFFSHORE & YARD PROJECTS (PETROBEL & ENI) | RINA | AUG 2016 – SEP 2020

Baltim SW Platform Project

Oversaw fabrication of 12,000 inch TSF piping (duplex & dissimilar materials) and deck/jacket/pile structures.Coordinated GLT & CLT commissioning and hook-up execution.Delivered a 2,800-ton offshore platform with commissioning readiness.

Picture 4.jpg

Supervised fabrication & erection of bridges & heavy steel structures. Controlled materials, consumables, and WPS compliance.Conducted inspections & submitted compliance reports.

DSC_6832.jpg

BRIDGES & STEEL STRUCTURES | SGS COMPANY & AUF FACTORIES | OCT 2011 – AUG 2016

CEMENT PRODUCTION PLANT (2X1.6M TPY), ARISH | SINOMA-TCDRI | JUL 2009 – OCT 2011

Inspected erection & welding of pressure vessels, tanks, mills, kilns & silos.Verified welding parameters, WPS/PQR, and NDT testing. Coordinated fabrication & erection activities.

images.jpeg

Conducted NDT (UT, MT, PT, RT, VT) for vessels, tanks, structures, and civil projects.Developed & reviewed WPS/PQRs, maintained calibration & inspection records.Performed visual & radiographic inspections.

Create an image of oil and gas project (2).jpg

NDT & CIVIL PROJECTS | QUALITY ENGINEERING GROUP (QEG) | AUG 2007 – SEP 2009

Screenshot 2026-01-22 at 8.21.32 PM.png
Contact :
Mohamed Elbeshlawy
Mob: 
(+)2 - 01275166972
Email : elbeshlawy_2008@yahoo.com
DESIGNED FOR MOHAMED ELBESHLAWY
About Mohamed:
 

Driving excellence in complex Oil & Gas, LNG, and Refinery projects, I bring 15+ years of proven expertise as a Piping and Welding Engineer with global impact. My professional journey is marked by technical mastery, a relentless focus on safety, and the ability to transform complex engineering challenges into successful project outcomes.

I have had the privilege of working on landmark global projects such as the Mozambique LNG Development, Zohr Gas Field (Mediterranean’s largest), Assuit Hydrocracking Complex, and MIDOR Refinery Expansion, in collaboration with leading clients and contractors including TotalEnergies, Technip Energies, Saipem, Petrojet, and ENI.

​

​​